cad@geodrafts.com
Construction Staking Drafting

Stakeout Sheets Crews Can Work From

GeoDrafts prepares staking plans, offset sheets, and point lists from the design and control data you supply — organized so field crews can set out with confidence.

Survey Plan — Interactive Preview

Legend — Monuments

Iron Rod (FND / SET)
Iron Pipe (FND / SET)
Boundary Corner
LOT 12N 512486.42E 2087330.15FND 1/2" IRON RODN 512540.18E 2087580.44SET 5/8" IRON RODN 512438.77E 2087805.62FND 1" IRON PIPEN 512286.05E 2087830.90SET 1/2" IRON RODN 512192.33E 2087546.28FND 5/8" IRON RODN 512272.60E 2087198.37FND 1" IRON PIPEEL 412.8EL 415.2EL 409.6EL 411.3EL 414.0N/F T. KOWALSKI — LOT 10N/F M. CHEN — LOT 11N/F A. RIVERA — LOT 13N/F S. PATEL — LOT 9S 79°52'04" E 210.35'S 68°12'40" E 215.40'N 12°45'30" E 98.76'S 77°49'55" W 271.05'N 43°12'18" W 132.45'N 6°20'10" W 181.12'LOT 12 · BLOCK BMEADOWBROOK ESTATES SUBDIVISIONAREA: 43,560 SQ. FT. = 1.000 AC.HOUSEGARAGEBARNPATIODECKSHEDDRIVEWAYSIDEWALKDRAINAGE SWALECOUNTY ROAD 12R/O-W 60.0'
Sample SheetPrint / PDFSheet 01 / 03 · Rev A

Each layer is a survey type — click one to open its page.

Scope of Work

What This Service Covers

We build stakeout plans from supplied design points and alignments, produce offset and cut sheets as instructed, format coordinate point lists to your numbering rules, and organize everything into crew-ready packages.

GeoDrafts provides drafting and data preparation only. Field staking and layout verification remain with the client's survey crews.

Surveyor with equipment at a construction siteIllustrative sample Sample Sheet
On the Drawing

Construction Staking Drafting, Layer by Layer

This service's layer is highlighted on the plan. Click other layers to explore the related survey types we draft.

Survey Plan — Interactive Preview
Presets

Legend — Monuments

Iron Rod (FND / SET)
Iron Pipe (FND / SET)
Boundary Corner
LOT 12N 512486.42E 2087330.15FND 1/2" IRON RODN 512540.18E 2087580.44SET 5/8" IRON RODN 512438.77E 2087805.62FND 1" IRON PIPEN 512286.05E 2087830.90SET 1/2" IRON RODN 512192.33E 2087546.28FND 5/8" IRON RODN 512272.60E 2087198.37FND 1" IRON PIPEEL 412.8EL 415.2EL 409.6EL 411.3EL 414.0N/F T. KOWALSKI — LOT 10N/F M. CHEN — LOT 11N/F A. RIVERA — LOT 13N/F S. PATEL — LOT 9S 79°52'04" E 210.35'S 68°12'40" E 215.40'N 12°45'30" E 98.76'S 77°49'55" W 271.05'N 43°12'18" W 132.45'N 6°20'10" W 181.12'LOT 12 · BLOCK BMEADOWBROOK ESTATES SUBDIVISIONAREA: 43,560 SQ. FT. = 1.000 AC.HOUSEGARAGEBARNPATIODECKSHEDDRIVEWAYSIDEWALKDRAINAGE SWALECOUNTY ROAD 12R/O-W 60.0'
Sample SheetPrint / PDFSheet 01 / 03 · Rev A

Survey Type · Spot Levels

FEMA Elevation Certificate Drafting

Supporting diagrams and drafted documentation for elevation certificates, prepared from your field data for review by the licensed surveyor.

PDFDWGDXF

Click any layer on the plan — each one maps to a survey type we draft.

Typical Inputs

What we work from — all supplied by you.

  • Design files and point data supplied by the client
  • Control information and coordinate references
  • Client point numbering and sheet standards
  • Written instructions on required staking detail

Deliverables & Formats

What you receive at handover.

  • Stakeout and setting-out plans
  • Offset and cut sheets as instructed
  • Coordinate point lists in agreed formats
  • PDF plots and editable CAD files
DWG DXF PDF CSV point files
Typical Applications

Where This Work Fits

Setting-out support for construction crews

Control documentation packages

Progress check drawings from supplied data

Foundation and layout sheets

Workflow

How the Project Runs

STEP 01

Review design data

Supplied points and alignments are organized.

STEP 02

Build staking sheets

Plans are drafted to your crew's working format.

STEP 03

Point lists

Coordinates are formatted to your numbering rules.

STEP 04

Check

Sheets are reviewed against the supplied design.

STEP 05

Deliver

Crew-ready packages are handed over.

FAQ

Construction Staking Drafting — Questions