cad@geodrafts.com
Route and Right-of-Way Survey Drafting

Linear Projects, Drawn Station by Station

GeoDrafts prepares alignment drawings, strip maps, and right-of-way exhibits from the stationing and parcel data you supply — linear documentation organized for roads, pipelines, and corridors.

Survey Plan — Interactive Preview

Legend — Monuments

Iron Rod (FND / SET)
Iron Pipe (FND / SET)
Boundary Corner
LOT 12N 512486.42E 2087330.15FND 1/2" IRON RODN 512540.18E 2087580.44SET 5/8" IRON RODN 512438.77E 2087805.62FND 1" IRON PIPEN 512286.05E 2087830.90SET 1/2" IRON RODN 512192.33E 2087546.28FND 5/8" IRON RODN 512272.60E 2087198.37FND 1" IRON PIPEN/F T. KOWALSKI — LOT 10N/F M. CHEN — LOT 11N/F A. RIVERA — LOT 13N/F S. PATEL — LOT 9S 79°52'04" E 210.35'S 68°12'40" E 215.40'N 12°45'30" E 98.76'S 77°49'55" W 271.05'N 43°12'18" W 132.45'N 6°20'10" W 181.12'LOT 12 · BLOCK BMEADOWBROOK ESTATES SUBDIVISIONAREA: 43,560 SQ. FT. = 1.000 AC.HOUSEGARAGEBARNPATIODECKSHEDDRIVEWAYSIDEWALKDRAINAGE SWALECOUNTY ROAD 12R/O-W 60.0'
Sample SheetPrint / PDFSheet 01 / 03 · Rev A

Each layer is a survey type — click one to open its page.

Scope of Work

What This Service Covers

We draft alignments from supplied stationing data, produce strip maps across the corridor, prepare ROW and take exhibits per your direction, and organize parcel tables and annotation so long linear projects stay consistent.

GeoDrafts provides drafting production only. Right-of-way determination and professional sign-off remain with the responsible licensed surveyor.

Aerial view of a river corridor suitable for linear route contextIllustrative sample Sample Sheet
On the Drawing

Route and Right-of-Way Survey Drafting, Layer by Layer

This service's layer is highlighted on the plan. Click other layers to explore the related survey types we draft.

Survey Plan — Interactive Preview
Presets

Legend — Monuments

Iron Rod (FND / SET)
Iron Pipe (FND / SET)
Boundary Corner
LOT 12N 512486.42E 2087330.15FND 1/2" IRON RODN 512540.18E 2087580.44SET 5/8" IRON RODN 512438.77E 2087805.62FND 1" IRON PIPEN 512286.05E 2087830.90SET 1/2" IRON RODN 512192.33E 2087546.28FND 5/8" IRON RODN 512272.60E 2087198.37FND 1" IRON PIPEEL 412.8EL 415.2EL 409.6EL 411.3EL 414.0N/F T. KOWALSKI — LOT 10N/F M. CHEN — LOT 11N/F A. RIVERA — LOT 13N/F S. PATEL — LOT 9S 79°52'04" E 210.35'S 68°12'40" E 215.40'N 12°45'30" E 98.76'S 77°49'55" W 271.05'N 43°12'18" W 132.45'N 6°20'10" W 181.12'LOT 12 · BLOCK BMEADOWBROOK ESTATES SUBDIVISIONAREA: 43,560 SQ. FT. = 1.000 AC.HOUSEGARAGEBARNPATIODECKSHEDDRIVEWAYSIDEWALKDRAINAGE SWALECOUNTY ROAD 12R/O-W 60.0'
Sample SheetPrint / PDFSheet 01 / 03 · Rev A

Survey Type · Road & ROW

Route and Right-of-Way Survey Drafting

Alignment drawings, strip maps, and right-of-way exhibits for roads, pipelines, and corridors, prepared from supplied stationing and parcel data.

DWGDXFPDFLandXML on request

Click any layer on the plan — each one maps to a survey type we draft.

Typical Inputs

What we work from — all supplied by you.

  • Alignment and stationing data supplied by the client
  • Parcel and ownership information provided for reference
  • Cross-section or profile data, where supplied
  • Client standards for sheets, symbols, and tables

Deliverables & Formats

What you receive at handover.

  • Alignment sheets and strip maps
  • Right-of-way and take exhibits as directed
  • Parcel tables and annotation as instructed
  • PDF plots and editable CAD files
DWG DXF PDF LandXML on request
Typical Applications

Where This Work Fits

Roadway and pipeline project documentation

Acquisition support packages prepared by the surveyor

Corridor mapping and reference drawings

Consistent multi-sheet linear sets

Workflow

How the Project Runs

STEP 01

Review stationing

Alignment and parcel data are organized by station.

STEP 02

Draft alignments

Corridor linework is drawn to the agreed scope.

STEP 03

Prepare exhibits

ROW and take exhibits are produced per direction.

STEP 04

Check

Sheets are reviewed for consistency across the corridor.

STEP 05

Deliver

Indexed sets are handed over in the agreed formats.

FAQ

Route and Right-of-Way Survey Drafting — Questions